Transformers are workhorses of electrical distribution. When a coil is damaged, owners and maintenance teams face three real choices: repair the fault, refurbish (a deeper rebuild), or replace the coil (or the entire unit). This article walks you through how to recognize each situation, the practical steps for each option, the trade-offs, and simple rules to help you decide fast — without guessing.
Early detection saves money. Watch for:
Unexplained overheating or recurring temperature spikes.
Frequent tripping or protection events (Buchholz alarms, pressure relief activations).
Abnormal sounds: humming, buzzing that changes after loading.
Reduced insulation resistance or failing dielectric tests.
Localized hot spots on thermal imaging.
Oil discoloration, carbon deposits, or unusual smells (signs of internal arcing).
Visible physical damage: cracked insulation, burned terminals, loose connections.
If you see any of the above, pull the transformer from service and run diagnostic tests (insulation resistance, turns ratio, power factor, dissolved gas analysis, and thermography) to quantify the damage.
Repairs are best when damage is limited, and the remaining asset life is reasonable.
Typical repairable cases
Minor insulation cracks or partial coating failures.
Loose or corroded electrical connections and terminal hardware.
Localized contamination: dirt, moisture, oil sludge that can be cleaned and dried.
Small, localized short circuits where only a few turns or a connection are affected (and the core is intact).
Common repair actions
Reattach, reseal, or replace damaged terminals and connections.
Local insulation patching or re-varnishing.
Targeted rewinding of a limited section.
Cleaning, vacuum drying, and oil filtration or replacement.
Post-repair acceptance testing (turns ratio, insulation resistance, hipot, and load test).
Advantages: fastest, lowest immediate cost.
Limitations: may not fully restore long-term reliability if other aging factors exist.
Refurbishment is a deeper overhaul intended to restore near-new performance without purchasing a new transformer.
When to choose refurbishment
The unit is structurally sound but shows multiple aging signs (insulation breakdown, oil degradation, partial winding damage).
Replacement parts for the whole transformer are available or rewinding is feasible.
The transformer is large or custom and replacement cost is high.
Typical refurbishment scope
Full diagnostic assessment and DGA.
Complete disassembly and inspection of core, windings, tank, and accessories.
Full rewinding or re-stacking of windings where required.
Replace all aged insulation, seals, and breathers; refurbish OLTC if present.
Clean, dry, refill with qualified oil, and re-test to factory or industry standards.
Advantages: often extends life significantly at lower cost than new. Can improve performance and efficiency.
Limitations: requires skilled technicians, downtime, and quality control—poor refurb can lead to repeat failures.
Replace when the risk or hidden cost of continuing is too high.
Replacement is recommended if:
Windings are fused, melted, or extensively burned.
Repeated failures persist after repair attempts.
Core or structural deformation exists from major faults.
The transformer is obsolete and spares are unavailable.
Total refurb/repair costs approach the price of a modern new unit, especially considering improved efficiency and warranty.
Advantages: predictable performance, warranty coverage, often better efficiency and features.
Drawbacks: higher capital cost and potential lead time for delivery.
Is damage localized and recent? → consider repair.
Is the distribution transformer otherwise in good condition and worth preserving? → consider refurbishment.
Are windings destroyed, or is equipment obsolete? → replace.
Factor in: age, availability of parts, criticality of service, lifecycle cost, and safety/regulatory requirements.
Small repairs are low cost but give limited life extension.
Refurbishment is cost-effective for large, expensive, or custom units.
Replacement often becomes economically sensible for older, lower-capacity units or when energy efficiency improvements offset capital cost.
Always compare total lifecycle costs (maintenance, losses, downtime, and risk) — not just the repair invoice.
Maintain a baseline test record (DGA, insulation, thermography). Early trends tell you when to act.
Use certified workshops for rewinding and refurbishment; quality workmanship and materials matter.
After repair/refurbish, mandate an acceptance test protocol and a staged return to service.
Keep spare parts and a service contract for critical transformers.
Consider modern upgrades (better insulation materials, improved OLTCs) during refurbishment.
Q: Can every coil be rewound?
A: Technically most can be rewound, but feasibility depends on space, core condition, and cost-effectiveness.
Q: Is refurbishing eco-friendly?
A: Yes — it reduces waste and resource use versus manufacturing a new unit.
Q: How long does a good refurbishment last?
A: With quality workmanship and oil/insulation replacement, refurbished units can reliably run many more years — often comparable to a new purchase for large units.
Don’t treat coil damage as purely a technical fix — treat it as an asset decision. Quick, small repairs are great for short-term fixes; refurbishment is a strategic way to extend life and improve reliability for valuable power transformers; replacement eliminates uncertainty when damage or obsolescence is deep. For critical equipment, combine robust diagnostics with a costed lifecycle analysis before choosing a path.